Greenfield cement plant project
Fabrication & Erection Progress Tracking System
A construction progress control system — not just a data-entry form. Structural steel fabrication, erection, equipment installation and plate material tracked level-wise, structure-wise, area-wise and contractor-wise, with planned versus actual control.
Level-wise control
Eight preheater levels with independent required, fabricated, erected and balance quantities.
1-minute site entry
Area → structure → level → item → quantity, with balance and duplicate validation built in.
Automatic reporting
Daily, monthly, contractor-wise and planned-vs-actual reports from one approved transaction set.
Works offline
Entries are saved on the device when connectivity drops and sync automatically without duplicates.